Architect, project manager or coordination: who runs your works in France while you live abroad
Before launching works, one question comes before all others: who runs them? The architect designs, carries the planning file and directs execution; the project manager designs and directs more modest works; works coordination organises the daily routine for an absent owner. This dossier compares the three roles, says how to choose according to the scale of the works, and how to keep the final say.
By Jean Mascla, founder of Home SelectUpdated · 7 min read
What exactly does each role cover?
The three figures complement one another more than they compete. The architect intervenes on the project as a whole: outline, drawings, planning permission, tendering, direction of the works. The project manager covers a similar spectrum on operations that stay below the legal threshold: studies, drawings, tendering, coordination of trades, site supervision. Coordination, for its part, designs nothing: it organises, checks and reports, on behalf of an owner who cannot be there.
Role
Scope
For which project
Architect
Design, permits and authorisations, full direction of the works
Conversions above the legal threshold, structural projects, changes to structure or facade
Project manager
Studies and direction of the works: drawings, tendering, supervision
Full renovations below the threshold, reshaping of homes
Works coordination
Organising the daily routine: access, schedules, appointments, photographic evidence, reports
Works by trade run by the owner, a presence relay for a property held from a distance
The boundary is drawn first by design. As soon as something must be drawn, partitions moved, a layout reworked or a planning file assembled, you need a designer, architect or project manager. When the project is already framed, with a written list of works, and the real difficulty is the owner’s absence, coordination becomes the heart of the arrangement.
Who signs what: three separate contracts
Then comes the question of contracts, which clarifies responsibilities. With the architect or project manager you sign a brief for design and direction of the works; separately, you sign with each tradesperson retained, because you remain the client for your own property. Coordination, for its part, is covered by a brief for organisation and reporting. Three distinct documents, three readable scopes: a little paperwork at the start, and a great deal of clarity afterwards, notably on the day a question of responsibility arises.
What does an absent owner gain from delegating the running of the works?
An owner who is present absorbs a building site’s daily routine without thinking: answering the tradesperson at the door, settling a finish on the spot, seeing progress at a glance. An owner abroad cannot. Every question becomes a message crossing time zones, every unplanned visit a missed opportunity, every silence a worry.
Delegating the running changes that relationship with time:
Tradespeople’s questions get an answer during your meeting hours, not when you wake up.
Technical visits take place without you, with someone who knows what to look at and what to ask.
Evidence of progress arrives filtered, dated and filed, instead of scattering across messages and calls.
The chasing nobody enjoys but everything depends on is carried by someone whose role it is.
A single contact knows the project end to end and prevents contradictory versions.
The gain is not mere comfort: a better-relayed site is a site that moves, because tradespeople work better when answers and access keep up. On this point, the works coordination of the Home Select concierge service is designed precisely for non-resident owners: it organises access, tracks milestones and reports back, in France as from your country of residence.
La Rochelle, Sud-Ouest
How do you decide according to the scale of the works?
Three scenarios cover most situations. The first: one-off works, a single trade, a bathroom to redo, a floor to replace, a full repaint. The tradesperson works alone, under your direct ownership, and coordination is limited to organising access and monitoring: nobody needs a designer.
The second: a full renovation without structural change. The project needs drawing, the trades follow one another, the interfaces multiply. A project manager then structures the operation, or solid coordination plays the orchestrator if your choices are already settled. It is the scenario where absence weighs most, because it is the one with thousands of small decisions.
The third: a heavy conversion, full reshaping, an extra storey, an extension, a facade refurbishment tied to a renovation. The architect becomes unavoidable, sometimes because the law requires one given the surface, always because the administrative file and the direction of the works demand it. The dossier running building works from abroad details the method that applies afterwards, whichever lead you choose.
One note for co-owned buildings: some works, such as a facade refurbishment voted at the general meeting, escape your individual arbitration. The decision is collective, execution goes through the managing agent, and your margin for manoeuvre concentrates on the interior layout and the monitoring of your own lots.
One last piece of arbitration advice: when the scale leaves you unsure, test the lead before the big project. Entrusting a secondary trade, a make-good or a supervised repair lets you gauge the quality of the reports, the reliability of the chasing and the precision of the information passed back. The relationship that will carry a full renovation is better tested on a modest brief than on a promise of appointments: the steadiness of a documented report says more than a sales folder.
How do you keep the final decision?
Delegating the running does not mean delegating the project. The rule protecting your control rests on three levels. The lead prepares: gathering the facts, asking the questions, proposing reasoned trade-offs. You decide: choice of work, of visible materials, of the calendar, of budgets added along the way. The lead executes the decision: passing it on, documenting it and checking it is applied.
In practice, fix from the start of the brief what must come back to you:
Anything changing the agreed budget or scope.
Anything touching visible materials and finishes.
Any schedule slippage, as soon as it moves an announced milestone.
Site discoveries, in photos, with the tradesperson’s technical opinion.
That trio, prepare, decide, execute, has a further virtue of record: every important decision is found dated, reasoned and documented. On the day a question comes back, and on a building site questions always come back, the written answer is already there. And the reporting rhythm, fixed at the start of the brief, turns monitoring into a habit rather than a permanent negotiation: that steady routine is what makes the distance bearable, for you as for those doing the work.
This written framework avoids the two symmetrical pitfalls: the lead who decides in your place, and the owner consulted about everything, down to the position of a socket. Properly set, the arrangement gives you back exactly what distance takes away: the ability to decide quickly, on reliable facts, when it matters.
Works are costed before the purchase offer, not after: your Home Select property finder brings a contractor or a project manager to the second viewing, so that the price offered accounts for what remains to be done.
After the signing, we introduce the project manager or architect who runs the project in your place, and the concierge service that opens the door and photographs progress. Running the works, the quotes and the handover are theirs, under their responsibility: our role is that there is a single point of entry.
Frequently asked questions
Is an architect mandatory for all works?
No. French law makes one mandatory above a surface threshold, for works subject to planning permission. Below it, and for many renovations, hiring one remains possible but is your choice.
Does works coordination replace a project manager?
No: coordination organises, relays and reports, but design and technical direction remain with building professionals. The two roles complement each other, especially for an owner living abroad.
Who chooses the tradespeople when the works are run for me?
You do, ultimately. An architect or project manager proposes a selection and opinions; a coordination service passes on quotations and prepares their comparison. The decision to engage, like payment, stays in your hands.
What exactly does each role cover?
The three figures complement one another more than they compete. The architect intervenes on the project as a whole: outline, drawings, planning permission, tendering, direction of the works. The project manager covers a similar spectrum on operations that stay below the legal threshold: studies, drawings, tendering, coordination of trades, site supervision. Coordination, for its part, designs nothing: it organises, checks and reports, on behalf of an owner who cannot be there.
What does an absent owner gain from delegating the running of the works?
An owner who is present absorbs a building site’s daily routine without thinking: answering the tradesperson at the door, settling a finish on the spot, seeing progress at a glance. An owner abroad cannot. Every question becomes a message crossing time zones, every unplanned visit a missed opportunity, every silence a worry.
How do you decide according to the scale of the works?
Three scenarios cover most situations. The first: one-off works, a single trade, a bathroom to redo, a floor to replace, a full repaint. The tradesperson works alone, under your direct ownership, and coordination is limited to organising access and monitoring: nobody needs a designer.
How do you keep the final decision?
Delegating the running does not mean delegating the project. The rule protecting your control rests on three levels. The lead prepares: gathering the facts, asking the questions, proposing reasoned trade-offs. You decide: choice of work, of visible materials, of the calendar, of budgets added along the way. The lead executes the decision: passing it on, documenting it and checking it is applied.
Preparing a purchase in France from abroad, or already an owner there? Describe your situation: a Home Select property finder answers within one working day, and the file starts with the right partners, in the right order.
Your request is already sent, simply pick what suits you.
A property finder calls you back within one working day.
🇫🇷+33
An error occurred. Please try again.
Then answer 3 quick questions to be matched with the right hunter.
Home Select processes your data (name, email, phone, project) to handle your request and contact you. It is recorded in our follow-up tool and read by the hunter in charge of your project. Our technical providers access it for hosting, email and checking that your email and number are real, some of them from the United States under the safeguards set by the GDPR. We keep it for three years after our last exchange, or five years after the end of our assignment if you entrust it to us, as French anti-money-laundering law requires. To access, correct or erase it, or to object to its use: contact@home-select.fr. Details in our privacy policy.
Your hunter calls you back within one working day.
Resume your request?
You started a request recently. Pick up where you left off, or start over.
Your answers are kept for 24 hours.
What is your project?
Takes 1 minute, no commitment.
Where are you looking?
Select one or more cities or areas
Your budget?
€
You pay only when Home Select finds it.
Anything to add?
Optional. Add any useful details: specifics about your search, constraints or your availability.
This helps your hunter prepare for your call.
An expert will contact you shortly
Your brief
Confidential search: your file goes to a senior hunter.
60 rue François 1er, 75008 Paris · FCI member
FeesOne month’s rent excluding charges, plus VAT, with a minimum of €2,000 including VAT. Payable only when the lease is signed. No application fee.
Step 1 of 2 · Your search
What are you looking for?
Furnished, unfurnished or both?
In which city?
One or more cities or areas.
€ / month
Charges included, as in the listings.
You would like to move in
Two minutes, no documents needed at this stage.
FeesOne month’s rent excluding charges, plus VAT, with a minimum of €2,000 including VAT. Payable only when the lease is signed. No application fee.
Step 2 of 2 · Your situation
Your situation
These answers let Home Select tell you quickly, and frankly, whether your search can succeed on the market in your city.
You are applying
€ / month
Before tax, regular bonuses included, for everyone applying.
Main applicant’s employment
Your company is based in France
Number of annual accounts filed
To strengthen your file
Optional for your profile. A guarantee reassures landlords.
Guarantor’s situation
€ / month
Who it is for, why you are moving, what matters to you. Do not include sensitive information (health, origin, religion, family situation).
Your contact details
🇫🇷+33
Reply within 24 business hours.
Home Select processes your data (name, email, phone, project, employment, income, guarantee) to review your rental request and contact you. Your answers are compared with the criteria landlords apply, then read by Home Select’s rental hunter. A request that cannot succeed receives a written reply within 24 business hours, and you can ask for it to be reviewed again at contact@home-select.fr. Our technical providers access it for hosting, email and checking that your email and number are real, some of them from the United States under the safeguards set by the GDPR. A request that does not lead to an assignment is erased after three months; otherwise, we keep your data for three years after our last exchange, or five years after the end of our assignment if you entrust it to us, as French anti-money-laundering law requires. To access, correct or erase it, or to object to its use: contact@home-select.fr. Details in our privacy policy.
FeesOne month’s rent excluding charges, plus VAT, with a minimum of €2,000 including VAT. Payable only when the lease is signed. No application fee.
Your file
Your file matches what landlords expect
Book your meeting with Stéphane Martins, rental hunter. He confirms it after reading your file, within 24 business hours.
Choose your time slot
Times shown in Paris time.
Confirmation arrives by email and text message.
FeesOne month’s rent excluding charges, plus VAT, with a minimum of €2,000 including VAT. Payable only when the lease is signed. No application fee.
Your request
Your request is in good hands
Stéphane Martins, rental hunter, is reviewing your file and will reply within 24 business hours.
You will receive a confirmation email.
You arrived through one of Home Select’s ads or campaigns.Ad measurement.Do you agree to Home Select measuring how well it works? Home Select will know which campaign brought you here and, if you get in touch, the ad platform will only learn that its ad worked, without receiving your contact details.Do you agree to Home Select measuring how well its ads work? If you arrive through one of them, Home Select will know which one and, if you get in touch, the ad platform will only learn that its ad worked, without receiving your contact details.Learn moreYour current choice: .